Validated Purified Water System for CRO cGMP Manufacturing Facility in San Diego, CA

Water Works, Inc. (San Diego, CA)  announces the completed installation of a validated purified water systems in San Diego, CA. The system supports cGMP manufacturing of pre-filled USP purified water, as well as internal research.

INSTALLATION OVERVIEW

The company was undergoing rapid growth and needed to relocate to a larger and more modern manufacturing facility.  However, since its existing water purification system was not movable, the customer wanted to switch to a new, expansion-ready purification system.

To ensure business continuity, future flexibility in moving, and to reduce installation cost, Water Works designed a custom tandem skid to house the validated purified water system. The skid was designed to be able to be disconnected, put on wheels and be move-ready in 30 min. The purification system was manufactured, assembled, and tested offsite, then delivered and installed at the new location with minimal downtime in manufacturing operations.

To ensure the reliability essential for cGMP manufacturing of clinical trial materials and commercial pharmaceutical products, Water Works replaced the old manual flood-prone controllers with reliable, programmable, solid-state controllers and UL listed control panels.